• Thoroughly Review all the documents provided by the Main Contractor, Clients, and/or Consultants Drawings, Specifications, Addendums, Special instructions, and BOQ (if any) before tendering to determine the scope of work and proceed with estimation.
• Quantity Take-off for MEP Services (Electrical, HVAC, and Plumbing).
• Research to obtain updated data on labor and materials costs by sending RFQs to approve vendors.
• Utilized cost estimation systems to document project information and create estimates.
• Prepare an Estimation Sheet based on the provided documents, gathered data from suppliers/vendors, and quantity take-off.
• Prepare Proposal Quotations after finalizing the Material Cost, Labor Cost, Overhead, Profit, and Risk.
• If there are revisions and additional documents for Tender Works, review all the previous documents received and revise the quotation if necessary.
• Do Site Survey, Prepare Target for each project and monitor if the Target Billing for the said project have been achieved.
• Prepare a Bill breakdown and progress billing for the Job in-hand project based on the Site Progress Report and Approved BOQ that will used for the Invoice.
• Identify the differences or discrepancies on the Tender Plan and Shop Drawings, and prepare variation reports as needed.
- • Assist the Draftsman and Engineer in preparing MEP Shop Drawings.
Job Details
Posted Date: | 2024-07-26 |
Job Location: | United Arab Emirates – Dubai |
Job Role: | Engineering |
Company Industry: | Project & Construction Planning |
Monthly Salary: | US $3,000 |